Important disclaimer
DrawMyPlace produces illustrative concepts for visualisation, comparison and rough estimates. Nothing it produces is a building design, an electrical design or executive documentation, and no output is checked or approved by anyone. The schematic table only adds up the power you declare, as an indicative figure. That sum is not a load calculation or a design under building or electrical regulations. It does not calculate voltage drop, short-circuit or earth-fault protection, structures or gas systems. Cable sizes, protective devices, circuits, installation methods, legal requirements and every construction decision must be verified by a person holding the qualifications required by law. Electrical work can cause electric shock and fire: never carry it out on the basis of this concept alone.